70 Stories High: Massive Helicopter Boiler Lift at Lake Point Tower

Project Details

Temperature Service Company, Inc. recently completed a comprehensive boiler plant modernization at Chicago’s recognizable Lake Point Tower, situated at 505 N Lake Shore Drive. This major infrastructure upgrade was designed to transition the property from an aging system to a modern, highly efficient hot water plant, significantly improving both the building’s heating reliability and its overall energy footprint.

Our Scope of Work Engineered by TSC Professionals:

Our mechanical engineering team and project managers carefully mapped out a complete overhaul of the existing steam boiler setup. Executing a project of this scale required intricate logistical planning. From safely dismantling and disposing of the old boiler enclosures and flues to performing structural concrete scanning and coordinating high-altitude helicopter rigging, the result is a seamless transition to a fully automated, state-of-the-art heating solution.

Key Highlights:
  • Safe and strategic demolition of the legacy boiler systems, followed by highly synchronized rooftop helicopter equipment rigging made possible through a strategically coordinated intersection closure at Ohio St. and Grand Ave.
  • Installation of advanced mechanical technology, featuring multiple high-efficiency condensing boilers, integrated leak detection safety systems, and smart building automation controls.
  • Comprehensive system flushing, pressure testing, certified balancing, and manufacturer-certified startups to guarantee peak operational performance and safety.

This project reflects Temperature Service Company’s ongoing commitment to delivering elite mechanical engineering and HVAC solutions tailored for complex, large-scale facilities.


PROJECT/EQUIPMENT SPECIFICS & REQUIREMENTS

  • 4 New Patterson-Kelley Hot Water High-Efficiency Condensing Boilers
  • Coordinated Shutdown of Ohio St. and Grand Ave. Intersection
  • Coordinated Midwest Helicopter Lift for Boiler Rigging
  • 4 Taco Model KV 4007 In-Line Pumps (240 GPM @ 35′ TDH, 5.0 HP)
  • 4 Taco Multi-Purpose Triple Duty Valves (4″ flanged)
  • 1 Spirotherm Hydraulic Separator
  • Double-Wall Prefabricated Vent and Combustion Air System
  • New Carbon Monoxide Detector & Tox-Refrig Leak Detector System
  • Integration with the Building Automation System (BAS)
  • Custom Structural Analysis and 4” Concrete Equipment Pad
  • Completed within Budget and with Approved City of Chicago Permits

PROJECT GALLERIES

GALLERY 1 – CHICAGO SKYLINE AND BUILDING PHOTOS
GALLERY 2 – BEFORE PHOTOS
GALLERY 3 – HELICOPTER LIFT DAY
GALLERY 4 – BAS CONTROLS AND BOILER INSTALLATION
GALLERY 5 – FINAL RESULTS
Like this Project Spotlight?

SUBSCRIBE TO OUR EMAIL LIST

–––  PLEASE SHARE  –––

We're passionate about our work and hope you share our enthusiasm! If you appreciate what you see or know someone who could benefit from our services, please feel free to share this page using the convenient Social Media buttons below. It's easy, and we truly appreciate your support!

Back To Projects Print

Is your building needing major upgrades?

If so, use the form below and let us know. We're happy to help!

  • This field is for validation purposes and should be left unchanged.

Or simply call 847-640-0505 to speak with a TSC Sales Representative.